Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsSteel Structure Warehouse

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings

China Shandong Sinoacme Steel Structure Co., Ltd certifications
China Shandong Sinoacme Steel Structure Co., Ltd certifications
My goods arrived the port of Algiers in good condition last month, honestly,supplier are really well-considered and work meticulous, all the consumables were packed well, and each parts was marked in the right position. The steel work is also perfect. I am satisfied and wish the next cooperation.

—— Medina

I was so impressed by one of the engineer in your company whom provided with reasonable and cost saving design plans for me to consider when my last visit in your factory. Surely was an rewarding and deserved trip. By the way, the foods local are really delicious. Hope the next visit.

—— Anis

I'm Online Chat Now

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings
Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings

Large Image :  Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings

Product Details:

Place of Origin: China
Brand Name: Sinoacme
Certification: ISO,SGS
Model Number: SWH022

Payment & Shipping Terms:

Minimum Order Quantity: 200 sqm
Price: Negotiable
Packaging Details: Loading in containers
Delivery Time: 30-45days
Supply Ability: 100000sqm/month
Detailed Product Description
Slop Method: Single/Double/Multi Slop Forming: Hot-rolled Steel
Dimensions: As Per Customers' Requirement Seismic: 9 Points
Roof Cladding: Color Steel Sheet(sandwich Panel) Wind: Up To 200km/h
Steel Grade: Q235B Or Q345B Life Time: More Than 50 Years
Name: Steel Structure Warehouse
High Light:

steel warehouse buildings

,

steel factory buildings

 
Gable Frame Metal Building Prefabricated Steel Structure Warehouse:

 

Metal Structure Warehouse is formed by the Primary Framing through connected with the Roof and Wall Bracing , Tie Beam ,Roof Purlin , Wall Girt , Roof and wall panel can use a variety of panels such as corrugated single color sheet or sandwich panel .

 

Metal structure warehouse has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiful appearance, short construction time,good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout,etc.

 
The Advantages of Metal Structure Warehouse as follows:
1). Features: fast and flexible to assemble, secure and safe, thermal and noise insulation, water proof and fire prevention;
2). Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
3). Durability: The whole structure are easy in maintenance, which can be used for more than 50 years.
4). Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it’s also in line with the national level of fire prevention.
5). Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.

 
Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings 0
 
Sinoacme steel structure production procedure:
 

  • Design: The design will be made with full design parameters provided by clients;
  • Material: Raw material will be prepared according to the material list provided by engineers;
  • Cutting: Steel plate will be cut according to the detailed drawing provided by engineers;
  • Assembling: Apply spot welding to assemble two pieces flange plate and one web plate together;
  • Auto welding: Arc-submerging machine will be applied to make full welding for steel components;
  • Straightening: To make the deformation of flange and web plate to flat;
  • Manual welding: Welding the connection plate and purlin plate to the main steel components;
  • Shot blasting: To get rid of rust on the surface of steel components;
  • Painting: Antiseptic treatment;
  • Delivery: Packing, loading and deliver to construction site;
  • Erection: Erect according to the erection drawing provided by engineers;
  • Finishing: Whole project completed.

 

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings 1

 

Sinoacme steel structure customer visiting:

 

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings 2

 

Sinoacme steel structure projects:

 

Prefabricated Steel Structure Warehouse Gable Frame Industrial Metal Buildings 3

 

Sinoacme steel structure components:

 

Material List
 Foundation  Anchor bolts    Canopy  Steel frame + steel sheet
 Column  H section steel  Roof cladding  EPS sandwich panel
 Tubular pillar  PU sandwich panel
 Lattice column  Rockwool sandwich panel
 Cross column  Corrugated steel sheet
 Box column  Skylight panel
 Beam  H section steel  Ventilator
 Lattice beam  Wall cladding  EPS sandwich panel
 Pipe truss  PU sandwich panel
 Space frame  Rockwool sandwich panel
 Roof purlin  C section steel  Corrugated steel sheet
 Z section steel  Mezzanine  Decking floor
 Wall purlin  C section steel  Checkered steel plate
 Tie bar  Steel pipes  Fasteners  High strength bolts
 Roof bracing  Angle steel  Common bolts
 Steel round bar  Expansion bolts
 Column bracing  Angle steel  Accessories  Flashing
 Steel round bar  Trim
 Sleeves  Steel pipes  Gutter
 Knee bracing  Angle steel  Downpipe

Contact Details
Shandong Sinoacme Steel Structure Co., Ltd

Contact Person: Frank

Send your inquiry directly to us (0 / 3000)